Home › Commercial Fencing › Midland–Odessa

Commercial & Security Fence in Midland–Odessa

All-State builds security and perimeter fence for oilfield sites, yards, plants and commercial property across the Permian Basin, from the Midland & Odessa Fence Supply Center on Highway 191, between the two cities. Heavy chain link to twelve feet, barbed wire and razor ribbon, welded gates, cantilever roll gates, and electric operators with access control.

The crews are ours. The equipment is ours. The material comes off our own shelves, ten minutes from most jobs in either city, which is why a change order on a Tuesday doesn’t turn into a two-week wait on a supplier. We have been building fence in West Texas since 1979, and building it in the Basin long enough to know what caliche does to a post hole and what the wind does to a gate that was hung square in June.

Since 1979Family-owned West Texas fence company
ISNetworld & VeriforceMember of both
Spec sheet with every bidSee exactly what you’re buying
Our own crewsSafeLand, H2S and OSHA 10 trained

Compliance, before anyone asks

Most operators in the Basin will not let a contractor through the gate without a current compliance record, and the safety department checks it before the procurement department returns a call. All-State’s is current, and it is in the two databases operators actually pull from. We are approved vendors for almost all major oil and gas companies.

ISNetworld. Member, listed under KB-SM, LTD — the legal name behind All-State Fence Company. If your safety group searches for us there, that is the name on the record. Company ID 400-174096.

Veriforce. Member, also listed under KB-SM, LTD. SSQ ID 65786.

Insurance. Workers’ Compensation, General Liability and Umbrella, at limits oil and gas operators accept. Certificates go out the same day you ask for them.

PPE on every crew. Every crew working in the Permian carries the PPE the industry requires.

All-State Fence & Supply technician working on an electric gate operator on a chain link gate
An All-State technician working on a commercial gate operator.
Chain link gate with a barbed-wire top and an electric gate operator
Chain link with a barbed-wire top and an electric gate operator.

Security and perimeter fence

Heavy-gauge chain link fabric in six, seven, eight, ten and twelve foot heights, in 9 gauge (11 gauge up to eight feet), hung on Schedule 40 posts set in concrete. Three strands of barbed wire or razor ribbon across the top, on outrigger arms turned in to keep people in, or out to keep people out. Galvanized for most sites, with vinyl-coated fabric by special order where appearance matters.

The specification that separates a five-year fence from a fifteen-year fence is the finish on the fabric. We hang galvanized-after-weave, where the zinc goes on after the wire is woven and coats the cut ends and the knuckles. Galvanized-before-weave is cheaper, and it rusts first at every place the wire was cut — which, on a twelve-foot run, is thousands of places. On a bid sheet, both say “galvanized.”

Gates

We build gates in our own shop and hang them on site: custom welded double-swing gates, and cantilever roll gates for wide openings. A gate is sized to your opening rather than your opening being sized to a gate that came off a shelf.

For anything a truck drives through daily, we usually recommend a cantilever roll gate over a double swing. A cantilever is the heaviest gate we fabricate, it needs the least maintenance over time, and it’s a lot cheaper to automate if you add an electric gate operator. It rolls parallel with the fence line, so it doesn’t take up room on the site — you can still park vehicles and stack materials near the gate. Gates and operators in Midland–Odessa →

Commercial chain link cantilever gate with an electric gate operator at an industrial site
A cantilever roll gate rolls parallel with the fence line, so it takes up no room on the site.
Gate operator with a keypad on a pedestal at a chain link gate
A gate operator with a keypad on a pedestal at the entry.

Operators and access control

Our standard commercial operator is the LiftMaster Elite 3000 — one horsepower, two transmitters with each unit. We install it on gates we build and on gates you already have, and we diagnose and repair operators of every make and model.

Access control is built around how the site actually runs. Push-button entry on an in-ground pedestal, set at window height for a pickup. Proximity card readers and cards for crews and contractors. Keypads where a code is easier to manage than a card. And underground exit loops, so a loaded truck leaving the yard opens the gate without a driver reaching out the window in the dark.

Walk gates with panic hardware

Fenced sites need egress, and OSHA is specific about it. We build and hang walk gates with panic bars and self-closing hinges, so a man can get out of a fenced yard in a hurry without the gate being left open behind him.

Digging in rock

The Basin is caliche over rock, and a post hole here is not the hole a fence crew digs in Lubbock. Our crews run CAT 299D skid steers with augers built for it. Holes come out to depth and to diameter, which is what lets the concrete do its job — a shallow hole backfilled with dirt is how a twelve-foot fence ends up leaning after the first real wind.

The spec sheet comes with every bid

Every commercial quote we send line-items the material: fabric gauge and finish, post schedule and diameter, set depth, top rail size, gate frame tube, operator model. It takes us an extra half hour and it tells you something a total never will.

Two bids arrive at the same number. One is nine-gauge galvanized-after-weave on Schedule 40 set thirty inches; the other is eleven-and-a-half gauge galvanized-before-weave on Schedule 20 set eighteen. Both say “8' chain link, barbed top.” Put the spec sheets side by side and the difference stops being a matter of trust.

How a job runs

Send us the site — an address, a lease name, or a pin — with rough footage, the height you need, and how many gates. We walk it, take our own measurements, and look at access, grade and where power is. The bid comes back with the spec sheet attached. Once it’s signed, you get a firm start week, and the crew works the site until it’s finished rather than splitting between three jobs.

Where we build: Midland and Odessa, out across the Permian Basin, and into eastern New Mexico.

Schools and public sites

School districts are specifying security fence now the way industrial sites always have: controlled entry, panic-bar walk gates for egress, and a perimeter that reads as a boundary rather than a decoration. We build to that spec, and we build it around bell schedules and summer windows.

Commercial work in Lubbock and Amarillo. Commercial projects in the South Plains and Panhandle run out of our Lubbock and Amarillo & Canyon Fence Supply Centers, with the same crews, specs and compliance record. Commercial fencing across West Texas →

What our Midland customers say

98 Google reviews for the Midland & Odessa Fence Supply Center, averaging 4.7 stars.

Get a bid

Send the site and we’ll walk it. The bid comes back with the spec sheet, so you can see exactly what you’re buying. Or call the Midland office at (432) 563-1111.

Questions we get

Are you ISNetworld and Veriforce members?

Yes to both. Both list us under KB-SM, LTD (ISNetworld ID 400-174096, Veriforce SSQ ID 65786), the legal name behind All-State Fence Company, so search that name if you don’t find us under All-State.

What heights do you build?

Six, seven, eight, ten and twelve foot chain link, with barbed wire or razor ribbon on top and outrigger arms turned in or out, depending on which direction you’re securing against.

Do you install gate operators?

Yes. LiftMaster Elite 3000 with pedestals, card readers, keypads and exit loops, on gates we build and on gates you already have. We diagnose and repair operators of every make and model.

Can you dig in caliche and rock?

Yes. Our crews run CAT 299D skid steers with augers built for Basin ground, so holes come out at full depth and diameter instead of shallow and backfilled.

Do you carry the insurance oil companies require?

Workers’ Compensation, General Liability and Umbrella. Certificates go out the same day you request them.

Do you build in New Mexico?

Yes, in eastern New Mexico.

How fast can you start?

Every job that sets posts waits two business days for “One Call” to locate underground lines before we dig. Small repairs that don’t set posts can usually be worked in within a day or two, sometimes a week, and a gate operator diagnosis can be as soon as a day to a week out, depending on how busy our technicians are. New work runs from a few days to a few weeks, depending on the scope, how much digging the ground needs, and any special-order material.